Section 1 Basic Requirements

Article 7

The applicants for boiler manufacture licensing must have independent legal status or have registered in local governmental departments where the manufacturer is located.



Article 8

The boiler manufacturer must have suitable technical ability for boiler production and management.

1. The manufacturers should have enough technical staff for various technical processes including boiler manufacture, machining, NDE, welding, material examination and quality management. The technical staff of the manufacturer with license of level A and level B have to be no less than 10 % of all its employees, and those of level C and level D have to be no less than 5 % and not less than 5 persons. Enough professional welding and boiler manufacture technical staff must be employed by boiler manufacture.

2. The manufacturer shall have relevant personnel responsible for the stages in boiler manufacture including design, technology, material, cold working, hot working, machining, forming, welding, NDE, heat treatment, pressure test, product inspection and testing, standardization, metrology and quality management, etc.

3. Qualified NDE personnel and NDE items, qualified welders and welding operators, and welding items shall meet the requirements of the production of the products produced



Article 9

The requirements for workplace and technical facilities:

1. The area and height of workshop should meet the requirements for manufacture of boilers with the applied licensing level. The manufacturing process should be rationally arranged. The welding of pressure parts of boilers shall be performed in workshop.

2. Pipes and semi-finished products should be kept at the place under certain protection.

3. Warehouse for keep welding consumables that require control of temperature and humidity during storage must equipped with equipment to ensure the required temperature and humidity. Drying and temperature-maintaining oven to make these welding consumables ready for use is also required.

4. There should be radiographic testing site that can meet both product requirements and protection requirements. There should be basic conditions to ensure quality of developed negative film and the storage of the radiographs.

5. NDE facilities that fit for the manufacture of the products are required except NDE is performed by subcontractors.

6. Fixtures are required to meet demand of boiler product manufacture.

7. The Lifting capacity at main workshops should meet the manufacturing demand of boiler products.

8. The drilling and pipe-bending machines should meet the manufacturing demand of boiler products.

9. Welding machines that fit for boiler product manufacture are required.

10. Examination Platform and tools, and hydrostatic pressure testing facilities suitable for production are also required.

11. Mechanical property testing facilities, physical and chemical property examination devices or a consignment relationship of the above mentioned testing and examination with competent subcontractors are required.

12. The applicants should have the machining tools, including cutting machines, presses and bevel machines for both plates and pipes to meet the demand for the manufacture of boilers of applied licensing level. Compact boiler manufacturer must have the ability to turn out final products.

Article 10

The resources requirements for the manufacture licensing of organic fluid heater and the resources requirements for level A boiler parts may consult the relevant resource requirements for the manufacture licensing of level C and level A boilers respectively. Furthermore, the manufacturing equipment required should match the manufacturing products.

Section 2 Specific Requirements

Article 11

Specific requirements for manufacture licensing of level A boiler

1. Requirements for technical resource:

1) There should be chemical and physical property testing lab and metallographic examination lab suitable for the manufacturing products

2) There should be welding labs suitable for manufacturing products

3) There should be R&D capacity for design new products and the capacity for production of the new products.

4) There should be enough staff for standardization, metrology and enough full-time inspectors

5) There should be NDE examiners that hold RT III and UT III certificates in addition the examiners with level II certificates in RT, UT, MT, PT. Provided the NDE are consigned outside, the above requirements for examiners holding RT II and UT II certificates may be exempted.

6) The number and granted item of qualified welder and welding operator should be satisfying the requirements of production, it should be not less than 50 person-items in general.

2. Requirements for manufacture equipment and fixture:

1) The capacity of semi-automatic or automatic cutting machines should meet the cutting thickness demand for manufacturing level A boilers.

2) Welding equipment including automatic arc welding machine, gas shield arc welding machine and manual arc welding machine, etc. should meet the demand of the manufacturing products.

3) Level-A manufacturers must have two of the following three significant facilities:
If only one of the three is existent, the manufacturer can only apply for level A license of boiler parts manufacture.
1. Boiler drum manufacture equipment:
a) Hydraulic or oil presses with capacity of not less than 1000 tons.
b) Plat bending machine with bending capacity not less than 46 mm thickness of steel plate in general.
c) Heat treatment furnace for boiler cylinder.

2. Water wall production equipment (including welding, flattening and panel blending machines)

3. Spiral pipe production equipment and heat treatment furnace for headers of superheater and of reheater.

1) Metallographic examination apparatus suitable for manufacture of level A boiler products.

2) Standard metrological instruments for length, thermal, force, electric measurement or a fixed tracing system to for their magnitude.

3) Mechanical property testing machine, machining tools and instruments for prepare impact test specimen or having consignment agreement with competent subcontractor.

4) NDE equipment in good condition including thickness gauge, radiographic detector, ultrasonic flaw detector, magnetic particle and dye penetration testing devices are required provided NDE is performed by the manufacturer itself.



Article 12

Specific requirements for manufacture licensing of level B boiler

1. Requirements for technical resource:

1) There should be enough capacity for changing the requirements in drawing to actual manufacturing technology.

2) There should be enough full-time inspectors.

3) The qualified RT II and UT II examiners should not less than 2 persons respectively. The figures can be decreased to 1 person respectively provided the NDE are consigned outside.

4) The number and granted item of qualified welder and welding operator should be satisfying the requirements of production and not less than 30 person-items in general.

2. Manufacture and inspection and testing equipment

1) Press or the ability to coordinate quality warranty subcontractor is required to meet the demand of products

2) Plate bending machine is required to meet product demand (with bending capacity of 20-30mm thickness of steel plate in general)

3) The maximum lifting capability in main workshop should satisfy the product demand and normally be not less than 20 tons.

4) Enough welding equipment including automatic submerged arc welding machine, gas shield arc welding machine and manual arc welding machine, etc. are required to meet the demand of products.

5) Mechanical property testing machine and machine tools and instruments for preparing impact testing specimen or the ability to coordinating all the quality warranty tests are required.

6) Platform for lofting and examining bending pipe in accordance with requirements is needed.

7) Radiographic detectors (at least including one circumferential exposing radiographic machine) and one ultrasonic flaw detector are required to meet requirement of products provided the NDT is performed by the manufacturer itself.


Article 13

Specific requirements for manufacture licensing of level-C boiler

1. Requirements for technical resource:

1). There should be enough full-time inspectors.

2). The qualified RT II examiners should not less than 2 persons. The figures can be decreased to 1 person provided the NDE are consigned outside.

3). The number and granted item of qualified welder and welding operator should be satisfying the requirements of production and not less than 20 person-items in general.

2. Manufacture and Inspection and Testing Equipment

1) Press or the ability to coordinate a quality-warranty subcontractor is required to meet the demand of the manufacturing products.

2) Plate bending machine is required to meet the demand of manufacturing product (bending capability: 12–20mm thickness steel plate in general).

3) The maximum lifting capability in main workshop should satisfy the demand of manufacturing product and normally be not less than 10 tons.

4) Enough welding equipment including automatic submerged arc welding machine and manual arc welding machine, etc. is required and should meet the demand of the manufacturing products.

5) At least a radiographic detector in good condition is required to meet the demand of the manufacturing products provided the manufacturer itself performs the NDT.



Article 14

Specific requirements for manufacture licensing of level-D boiler

1. Requirements for technical resource:

1) At least one qualified RT II NDT examiner is required..

2) The number and granted item of qualified welder and welding operator should be satisfying the requirements of production and not less than 10 person-items in general.

2. Manufacture and Inspection and Testing Equipment

1) Equipment for cutting, welding, drilling, pipe-bending, plate-bending and machining is needed to meet the product's demand.

2) Forming and machining equipment are required to meet the demand of manufacturing products.

3) The maximum lifting capability in main workshop should satisfy the demand of manufacturing product and normally be not less than 5 tons.

4) At least one radiographic detector in good condition is required to meet the demand of the manufacturing products provided the manufacturer itself performs the NDT